Real Results

All real results

Date Name
Mar 08
2007
Thru-Tubing Intervention Increases Daily Oil and Gas Production of Pakistan Well

Conventional, Intervention and Abandonment, Real Result, Weatherford World

Mar 08
2007
Technology and Experience Renew Productivity in South Louisiana

Aging Reservoirs, Conventional, Production, Real Result, Unconventional, Weatherford World

Mar 02
2007
CTD® Motors Mill Successfully Through 2,272 ft of Flash-Set Cement

Conventional, Intervention and Abandonment, Real Result, Weatherford World

Mar 02
2007
eCTD™ Motor and MillSmartSM Technology Go the Distance, Save Operator Valuable Rig Time

Conventional, Intervention and Abandonment, Real Result, Weatherford World

Feb 15
2007
ACP™ Solution Prevents Another Expensive Cement Squeeze Job in Geothermal Well, Japan

Drilling, Real Result, Weatherford World

Jan 04
2007
ACP™ Annulus Casing Packer Converts into Open-Hole Bridge Plug to Permanently Plug Shale Formation, Dispose of Produced Water

Drilling, Real Result, Weatherford World

Nov 07
2006
Gas-Lift Optimization Audit Pays Off in Offshore Borneo

Production, Real Result, Weatherford World

Nov 01
2006
Tubing Packoffs with Live Gas-Lift Valves Restore Loaded High-Rate Gas Well to Production with Fast Payout

Aging Reservoirs, Conventional, Deepwater, Production, Real Result, Unconventional, Weatherford World

Oct 31
2006
Custom-Designed Gas-Lift Valve System Adds Up to 300 MCFD

Production, Real Result, Weatherford World

Oct 30
2006
Weatherford Gas-Lift Design Increases Production, Reduces Operating Costs

Aging Reservoirs, Conventional, Deepwater, Production, Real Result, Unconventional, Weatherford World