Real Results
Performance By The Numbers
Installed in World’s Largest Offshore Natural Gas Field Avoid TRSV Replacement Workovers
Location
Well Type
Formation
Depth
Products/Services
Number of jars to retrieve a PBS from the TRSV using 7/16-in. braided cable (2022 to 2024). The reliability of PBS enabled the operator to avoid costly TRSV replacement workovers, which could occur if the TRSV internal mechanisms were damaged during acid stimulation of carbonate reservoirs.
Take the next step in realizing the field of the future. Submit your details and one of our optimization experts will be in touch.