Real Results
Performance By The Numbers
Enables Petrogas E&P to Extend Life of Field Using Existing Wellbore to Target Fine Sand Reservoir
Operator
Location
Field
Well Type
Formation
Hole Size and Angle
Depth
Products/Services
This North Sea platform has been in operation since 2007. A sand-free completion installed across a shallow sandstone reservoir will extend production far beyond the 10 years initially envisaged.
Take the next step in realizing the field of the future. Submit your details and one of our optimization experts will be in touch.