Real Results
Performance By The Numbers
Combined to Mitigate Ballooning Effect, Reduced Drilling Time by 25%, Eliminated NPT
Location
Well Type
Formation
Hole Size and Angle
Casing Size and Type
Measured Depth
Products/Services
Days vs. Depth plot: Actual time vs. plan where the green line is the previous technical limit, the black line is the planned drilling time per the drilling program, and the red line is the actual drilling time as delivered by Weatherford.
Take the next step in realizing the field of the future. Submit your details and one of our optimization experts will be in touch.