Real Results
Performance By The Numbers
Drilling Successfully Implemented in First Deployment in Deep Jurassic Reservoirs of West Kuwait
Location
Well Type
Formation
Hole Size
Production Casing Size
Measuring Depth
Products/Services
The pumping schedule of the managed pressure cementing of the 7 5/8-in. liner as displayed via a screenshot from the Victus simulation.
The 7 5/8-in liner cement bond logs from the offset wells cemented conventionally (left) showed moderate-to-poor cement behind the casing and channels within the cement as compared to case study well (right) completed with MPD and MPC techniques.
Take the next step in realizing the field of the future. Submit your details and one of our optimization experts will be in touch.