Real Results

Performance By The Numbers

Vero Mechanized System, PowerScope® Tong-Positioning System

Combine to Enhance Safety, Ensure Well Integrity, Improve Operational Efficiency

Objectives

  • Enhance safety: Reduce personnel exposure in the red zone, minimizing risks associated with manual operations.
  • Optimize workforce efficiency: Achieve personnel on board (POB) reduction by automating critical tasks, decreasing reliance on manual intervention.
  • Eliminate human factors: Remove human decision-making from well integrity processes to ensure consistency, accuracy, and reliability.
  • Improve operational efficiency: Reduce connection time and mitigate the risk of damaged connections, leading to smoother and more cost-effective operations.

Our Approach

  • Weatherford experts conducted in-depth discussions with the operator to understand operational goals, safety concerns, and efficiency requirements.
  • The combined teams analyzed historical well performance data to identify recurring issues related to personnel exposure, connection time, and well integrity risks.
  • Based on data insights, the team selected the Vero mechanized system to automate connections, ensuring consistent and precise execution. A key feature of the system is the integrated, real-time monitoring tools that validate connection integrity and reduce human decision-making errors.
  • This solution addressed concerns related to transitioning from manual to automated processes, ensuring seamless integration with existing infrastructure.
  • Weatherford provided technical training and support to operators, facilitating adoption of mechanized workflows.
  • Field personnel implemented the Vero system under controlled conditions, continuously monitoring improvements in connection efficiency and personnel safety.
  • The operation achieved significant POB reduction and improved connection consistency, minimizing damaged connections.

Value to Customer

  • Zero personnel in red zone: Compared to the traditional setup with five personnel, automation eliminated all human presence in the red zone while operating the system remotely from the driller’s cabin.
  • POB reduction: Optimized operations decreased POB from six to four, improving workforce efficiency.
  • Connection integrity at 100%: Automated evaluation ensured every connection met tubular OEM quality standards with absolute precision.
  • A 60% reduction in damaged connections: Automated makeup technology minimized errors, significantly enhancing reliability.
  • Reduced connection time by 15%: Full process automation streamlined operations, cutting down time and increasing efficiency.
Details

Location

Qatar

Well Type

Gas

Hole Size and Angle

8-1/2 in., horizontal

Casing Size and Type

  • Tenaris Wedge 563 Sanicro28
    7 in., 29ppf
  • VAM Top SM2535P110
    7 in., 26ppf

Depth

21,000 ft (6,400 m)

Products/Services

PowerScope Tong-Positioning System
Vero mechanized system

Contact Weatherford

Take the next step in realizing the field of the future. Submit your details and one of our optimization experts will be in touch.