Resource Hub

Advanced Search

LATEST BROCHURES

  • Progressing Cavity Pump Poster

    March 9, 2026
    Production

LATEST TECHNICAL SPECIFICATIONS

  • WellPilot® Rod Pump Optimization Controller Fixed Speed

    May 18, 2026
    Production

  • WellPilot® Variable-Speed RPCs

    May 18, 2026
    Production

  • Rotaflex® Long Stroke Pumping Unit

    March 20, 2026
    Aging Reservoirs, Conventional, Production, Unconventional

  • ForeSite Sense Optical

    February 26, 2026
    Completions

LATEST HIGHLIGHTED CASE STUDIES

  • Precise Placement Through Multiple Faults Record Lateral Demonstrates Magnus<sup>®</sup> Saker RSS Reliability in Challenging Carbonates

    Middle East

  • De-Risking a Faulted Carbonate Lateral Real-Time Geosteering Delivers Confident Crossings Zone Control in a Record-Breaking Run

    Middle East

  • Seamless Execution of Openhole Sidetracks Dual-Telemetry MWD Powers Fast, Accurate Multilateral Drilling in Clearwater Formation

    Canada

  • Narrow Margins to Confident Execution Successful Application of MPD Across 11 HPHT, Ultra-HPHT Wells in the North Sea

    North Sea, United Kingdom

LATEST REAL RESULTS

  • Narrow Margins to Confident Execution Successful Application of MPD Across 11 HPHT, Ultra-HPHT Wells in the North Sea

    May 15, 2026
    United Kingdom

  • Seamless Execution of Openhole Sidetracks Dual-Telemetry MWD Powers Fast, Accurate Multilateral Drilling in Clearwater Formation

    May 15, 2026
    Canada

  • Cut Downtime. Cut Costs. Keep Wells Flowing. Rigless Tubular Patch Solution Accelerates Large-Bore Well Recovery, Saves $16 Million USD

    May 6, 2026
    Kuwait

  • From Shut-in to Standout: Precision Modeling Meets Field Execution to Deliver Lasting Production Gains in Malaysia

    May 6, 2026
    Malaysia

LATEST PAPERS

  • Novel Foam-Assisted Gas Lift Technology for Resuscitation of High-Salinity and High-GOR Oil Wells

    November 3, 2025

  • Integrated Pulsed Neutron Logging and Nuclear Modelling for Formation Saturation and Gravel Pack Integrity Evaluation in Complex Sand Control Completions

    November 3, 2025

  • Rig-Less Surface Jet Pump Deployment: A Sustainable and Cost-Effective Solution for Well Revitalization: A Case study from UAE

    November 3, 2025

  • Field Evaluation of Non-Radioactive Multiphase Flow Meters: Performance Comparison, Accuracy and Reliability Assessment

    November 3, 2025

LATEST MULTIMEDIA

 
The Energy of Innovation
July 12, 2022
 
We Keep the Ball Rolling
July 10, 2020
 
Mature Field Solutions
April 30, 2020
 
Digitalization and Automation Solutions
April 30, 2020