Real Results

All real results

Date Name
Aug 07
2020
ForeSite Sense Reservoir Monitoring Delivers 100% Reliability Over 3 Years in a Multizone HPHT Offshore Well

Completions, Conventional, Real Result, Weatherford World

Jul 09
2020
COMPLETE Team Integrates Solutions to Deliver 30 Savings for Three North Sea Platforms

Completions, Real Result, Weatherford World

Jul 01
2020
Integrated Lower Completion With SwageSet Liner System and Maxflo Screen Installation Uses Minimal Cr

Completions, Real Result, Weatherford World

Apr 15
2020
Magnus® RSS Delivers Peak Performance, Service Quality to US Operators on Deep 12 1/4-In. Sections

Drilling, Real Result, Weatherford World

Mar 27
2020
ForeSite® Production Optimization Platform Drives $17.7M in Annual Incremental Value Through Improved Efficiency, Uptime, and Production

Production, Real Result, Weatherford World

Mar 20
2020
Integrated Completion Solution Saves 27+ Hours of Deepwater Rig Time in Santos Basin, Offshore Brazil

Completions, Real Result, Weatherford World

Mar 18
2020
Victus™Intelligent MPD Helps Major Operator to Reach Targets and Save $90 Million in 6 Wells

Drilling, Real Result, Weatherford World

Mar 12
2020
ForeSite® Production Optimization Platform Boosts Production by 5% During Phase-1 Rollout, Realizes $3.25 Million Per Year in Incremental Revenue

Production, Real Result, Weatherford World

Mar 03
2020
RipTide® RFID Drilling Reamer Successfully Enlarges Wellbore in Deepwater Sidetrack Well Without Incident or Delay

Aging Reservoirs, Completions, Deepwater, Drilling, Real Result, Unconventional, Weatherford World

Mar 03
2020
RipTide® RFID Drilling Reamer Enlarges Wellbore, Saves 2 Days of Rig Time Valued at $220,000

Aging Reservoirs, Completions, Deepwater, Drilling, Real Result, Unconventional, Weatherford World