Real Results

All real results

Date Name
Sep 13
2019
WidePak Straddle Packer Isolates Water Zone, Restores Production and Avoids Abandonment

Intervention and Abandonment, Real Result, Weatherford World

Sep 13
2019
Renaissance Capillary System Restores Production in Sour Gas Well, Saves 80% Over Cost of Conventional Workover

Intervention and Abandonment, Real Result, Weatherford World

Sep 13
2019
Renaissance Inverse Gas Lift System Eliminates Workover and Increases Production by 3,500 BOEPD

Intervention and Abandonment, Real Result, Weatherford World

Sep 12
2019
Minima Composite Frac Plugs Mill 50% Faster in a Performance Comparison With a Competitor

Completions, Real Result, Weatherford World

Sep 12
2019
Minima Composite Frac Plugs Reduce Mill-Up Time in Bakken Multizone Plug-and-Perf Completion

Completions, Real Result, Weatherford World

Sep 12
2019
Minima SW Special Weight Composite Frac Plug Accelerates Plug-and-Perf Operation with Average Mill-Out Time of 5 Minutes

Completions, Real Result, Weatherford World

Sep 12
2019
Minima Composite Frac Plugs Create 25% Less Well Debris, Reduce Drill-Out Times By 30%

Completions, Real Result, Weatherford World

Sep 12
2019
Minima Composite Frac Plug Reduces Cuttings by 40%, Improves Millout Times In Two Horizontal Wells

Completions, Real Result, Weatherford World

Sep 12
2019
Maxflo Screens with FloReg ICDs Deliver ~53,000 ft of Sand Control with No NPT in Six-Well Campaign

Completions, Real Result, Weatherford World

Sep 06
2019
FloReg Deploy-Assist Device Enables Sand-Screen Completion Without Wash Pipe, Saves $350,000

Completions, Real Result, Weatherford World