|
Jul 15 2025
|
Vero™ Mechanized System, PowerScope® Tong-Positioning System Combine to Enhance Safety, Ensure Well Integrity, Improve Operational Efficiency
Real Result, Tubular Running Services, Weatherford World
|
|
|
Jul 10 2025
|
Compact™ Drop-Off System Secures High-Quality Wireline Data Under Challenging Conditions, Saves $800,000 USD in Rig Costs
Formation Evaluation, Real Result, Weatherford World
|
|
|
Jul 06 2025
|
Reservoir Analysis Sonde Tool Introduced to Mexican Market, Quickly Improves Hydrocarbon Production
Formation Evaluation, Real Result, Weatherford World
|
|
|
Jun 30 2025
|
GuideWave® CLEAR Multilayer Mapping-While-Drilling Service Enables Geosteering in Complex, Extreme-Temperature, Extended-Reach Well
Drilling, Real Result, Weatherford World
|
|
|
Jun 27 2025
|
Compact™ Array Induction, Gamma Ray Tools Successfully Log Multiple Wells Through Fiberglass Casing, Resolve Earlier Data Uncertainty
Formation Evaluation, Real Result, Weatherford World
|
|
|
Jun 26 2025
|
Compact™ Logging Technology Samples Gas Using a Single-Fluid Identifier Sensor in Depleted, Shaly Sandstone Reservoir in Debut Deployment
Formation Evaluation, Real Result, Weatherford World
|
|
|
Jun 20 2025
|
Successful MPD Use in Mexico Enables Drilling HPHT Field With Uncertain Geological Environment Via Geological/Geomechanical Recommendations
Drilling, Real Result, Weatherford World
|
|
|
Jun 19 2025
|
High-Performance MPD Solutions Navigate Extreme Reservoir Conditions, Deliver Best-Performing Wells in Field, Unlock New Resources
Drilling, Real Result, Weatherford World
|
|
|
Jun 18 2025
|
TwinWells™ Ranging System, HyperLine™ Motor Drill 4,400-ft SAGD Injector Lateral in 7.75 Hours
Drilling, Real Result, Weatherford World
|
|
|
May 30 2025
|
WCGB-300 Latex Powder Enhances Gas Migration Control, Ensures Good Cement Bonding in Debut Deployment, Enhances Long-Term Well Stability
Completions, Real Result, Weatherford World
|
|