Real Results
Performance By The Numbers
Eliminates One Round Trip from Casing-Exit Sequence, Saving 30 Hours of Associated Rigtime
Location
Operator
Well Type
Hole Size
Casing Type/Size
Setting Depth
Products/Services
The AlphaV casing-exit system eliminates wellbore preparation runs by including a gauge mill and scraper assembly on the toolstring. The system increases tripping speeds by replacing traditional shear bolts with the HMR system to enable high-torque and load-bearing capabilities.
Take the next step in realizing the field of the future. Submit your details and one of our optimization experts will be in touch.