Real Results

All real results

Date Name
Aug 05
2021
ForeSite® Edge Boosts Production, Reduces Wellsite Visits 70%, Maintains Pump Fillage Above 70%, Increases Revenue $40K

Production, Real Result, Weatherford World

Aug 05
2021
Rod-Lift Solutions, Maximizer® Pumping Units Reduced OPEX 16% and Workover Costs 75% within Failure-Prone, 100-Well ESP Asset

Production, Real Result, Weatherford World

Aug 05
2021
Rod-Lift Solutions, Maximizer® Pumping Units Reduced OPEX 16% and Workover Costs 75% within Failure-Prone, 100-Well ESP Asset

Production

Aug 03
2021
Magnus® Rotary Steerable System Sets Field ROP Benchmark and Saves 9 Days of Rig Time, $1.1 Million in Iraq

Deepwater, Drilling, Real Result, Unconventional, Weatherford World

Jun 29
2021
Victus™ Managed Pressure Drilling, Revolution® Rotary Steerable System, and Vero® Automated Connection Integrity Save $1.5 Million in Rig Time

Drilling, Real Result, Weatherford World

Jun 29
2021
Multidisciplinary Solution Enables Operator to Complete Well 35% Faster and Exceed Production Expectations by 50%

Completions, Real Result, Weatherford World

Jun 27
2021
Integrated Services Team Helps Operator Reestablish Presence in Colombia with Zero HSE Issues and <3% NPT

Conventional, Real Result, Unconventional, Weatherford World

Jun 27
2021
Victus Intelligent MPD Installation on Jackup Rig Helps To Deliver Complex Wells Ahead of Plan in North Sea HPHT Drilling Campaign

Drilling, Real Result, Weatherford World

Jun 27
2021
Pressure Pumping Services, AcidSure System Increase Oil Production by 379 and Gas Production by 449 in HPHT Well

Completions, Real Result, Weatherford World

Jun 27
2021
TBlockSure® Diverting Agent Enables Rig-Free restimulation, Saves $40,000

Completions, Real Result, Unconventional, Weatherford World