Real Results
Performance By The Numbers
Achieved Longest 12 1/4-in. Sidetrack Run of an Extended Reach Well in Field, Saved 26 Days of Drilling Time
Location
Well Type
Hole Size and Angle
Footage Drilled
Formations Drilled
Products/Services
The robust, modular construction of the Magnus RSS helped the operation drill reliably, maintain trajectory, and reach TD faster without the requirement for a second bit run.
Take the next step in realizing the field of the future. Submit your details and one of our optimization experts will be in touch.