Resource Hub
LATEST BROCHURES
-
Sucker Rod Solutions
July 7, 2025
Production
-
Optimax™ Well Isolation Valve
June 13, 2025
Drilling
-
Calabar COROD®
May 22, 2025
Aging Reservoirs, Conventional, Production, Unconventional
-
SecureTrac Compact Casing Shoe System
May 15, 2025
Completions
LATEST TECHNICAL SPECIFICATIONS
-
Premium Sucker Rod Guide Materials
June 18, 2025
Production
-
PK-X Sucker Rod Guides
June 18, 2025
Production
-
PPSF20 Sucker Rod Guide
June 18, 2025
Production
-
KDP Sucker Rod
June 13, 2025
Aging Reservoirs, Conventional, Production, Unconventional
LATEST HIGHLIGHTED CASE STUDIES
-
Vero™ Mechanized System, PowerScope® Tong-Positioning System Combine to Enhance Safety, Ensure Well Integrity, Improve Operational Efficiency
Qatar
-
Modus™ Managed Pressure Wells Solution Optimizes Efficiency while Drilling in Hazardous Field, Saves $3.6 Million USD
Jambi, Indonesia
LATEST REAL RESULTS
-
Vero™ Mechanized System, PowerScope® Tong-Positioning System Combine to Enhance Safety, Ensure Well Integrity, Improve Operational Efficiency
July 15, 2025
Qatar
-
Advanced Multiconductor Jar Activates Two Openhole Coring Runs, Prevents Stuck Logging Tools and Costly Fishing Operation, Minimizes NPT
May 8, 2025
United States
-
COROD® Continuous Rod in Sandy, High DLS Well Reduces CAPEX 25%, Lowers Connected HP 40%, and Pumps 13K BBL/$1.3M without Intervention
May 8, 2025
-
Integrated Subsea Completion, Wellbore Cleanup Solution In the UK North Sea Reduces CO2 by 75%
May 2, 2025
United Kingdom
LATEST PAPERS
-
Drilling and Well Construction in Lean Clearances in Northern Region of Pakistan
December 19, 2023
-
Locating, Quantifying, and Remediating Downhole Sand Infiltration to Minimize Equipment Failures and Increase Oil Production: A Case Study in Kuwait
October 9, 2023