Real Results

All real results

Date Name
Aug 18
2021
Weatherford and Ardyne Technologies Deliver Innovative Casing-Recovery Solution for Fewer POB, Less CO2 Emissions, More Efficiency

Intervention and Abandonment, Real Result, Weatherford World

Aug 17
2021
Integrated Solution and Centro™ Platform Deliver Well 62 Faster With 32 More Production

Conventional, Deepwater, Drilling, Real Result, Unconventional, Weatherford World

Aug 05
2021
Fat Boy® PCP with Top-Tier System Increase MTBF from 55 to 370 Days, Decrease OPEX by 84%, Saves $2 Million in 9 Sand-Bearing Wells

Production, Real Result, Weatherford World

Aug 05
2021
ForeSite® Edge Boosts Production, Reduces Wellsite Visits 70%, Maintains Pump Fillage Above 70%, Increases Revenue $40K

Production, Real Result, Weatherford World

Aug 05
2021
Rod-Lift Solutions, Maximizer® Pumping Units Reduced OPEX 16% and Workover Costs 75% within Failure-Prone, 100-Well ESP Asset

Production, Real Result, Weatherford World

Aug 05
2021
Rod-Lift Solutions, Maximizer® Pumping Units Reduced OPEX 16% and Workover Costs 75% within Failure-Prone, 100-Well ESP Asset

Production

Aug 03
2021
Magnus® Rotary Steerable System Sets Field ROP Benchmark and Saves 9 Days of Rig Time, $1.1 Million in Iraq

Deepwater, Drilling, Real Result, Unconventional, Weatherford World

Jun 29
2021
Victus™ Managed Pressure Drilling, Revolution® Rotary Steerable System, and Vero® Automated Connection Integrity Save $1.5 Million in Rig Time

Drilling, Real Result, Weatherford World

Jun 29
2021
Multidisciplinary Solution Enables Operator to Complete Well 35% Faster and Exceed Production Expectations by 50%

Completions, Real Result, Weatherford World

Jun 27
2021
Integrated Services Team Helps Operator Reestablish Presence in Colombia with Zero HSE Issues and <3% NPT

Conventional, Real Result, Unconventional, Weatherford World