Papers

All papers

Date Name
Nov 30
2016
Reviving the Production of a Dead Well by testing it with Hydraulic Jet Pump

SPE Middle East Artificial Lift Conference and Exhibition, 30 November-1 December, Manama, Kingdom of Bahrain

Nov 30
2016
Production Enhancement by Installation of Jet Pump in SSD in Pakistan Ghauri Oil Field

SPE Middle East Artificial Lift Conference and Exhibition, 30 November-1 December, Manama, Kingdom of Bahrain

Nov 21
2016
AASP flooding as a Substitute of ASP Flooding for Chemical EOR in Carbonate Reservoirs

PAPG/SPE Pakistan Section Annual Technical Conference and Exhibition, 21-23 November, Islamabad, Pakistan

Nov 14
2016
Batch Completion Operations Cost Reduction in a Segregated Drilling Campaign: The Development of an Intervention and Completion Unit

International Petroleum Technology Conference, 14-16 November, Bangkok, Thailand

Nov 14
2016
MPD Closed Loop Cementing in High-Pressure, High-Temperature Wells in Vietnam

International Petroleum Technology Conference, 14-16 November, Bangkok, Thailand

Nov 07
2016
A Collaborative Approach for the Planning and Execution of a North Sea Drilling with Liner Operation

Abu Dhabi International Petroleum Exhibition & Conference, 7-10 November, Abu Dhabi, UAE

Nov 07
2016
Benefits Realized from Implementing Integrated Digital Field Technology in a Sector of Greater Burgan Field of Kuwait

Abu Dhabi International Petroleum Exhibition & Conference, 7-10 November, Abu Dhabi, UAE

Nov 07
2016
Key Tool for Production Optimization in Low Oil Price Environment- A Case Study on Integrated Asset Operation Model IAOM

Abu Dhabi International Petroleum Exhibition & Conference, 7-10 November, Abu Dhabi, UAE

Nov 07
2016
An Integrated Geomechanics and Real Time Pore Pressure Approach helps to Successfully Drill the First Horizontal Well Along the Minimum Horizontal Stress Direction in Tight Sandstone Formations

Abu Dhabi International Petroleum Exhibition & Conference, 7-10 November, Abu Dhabi, UAE

Nov 07
2016
Free Rotating Eccentric Guide Shoe Reached TD in High Angle Well Saves ±60 Hours of Rig Time

Abu Dhabi International Petroleum Exhibition & Conference, 7-10 November, Abu Dhabi, UAE