Resource Hub
LATEST BROCHURES
-
Casing Recovery Solutions
August 22, 2024
Intervention and Abandonment
-
ForeSite EDGE
August 19, 2024
Aging Reservoirs, Conventional, Production
-
ESS® Expandable Sand-Screen System
August 7, 2024
Completions
-
Remote-Opening Barrier Valve
June 18, 2024
Intervention and Abandonment
LATEST TECHNICAL SPECIFICATIONS
-
Endura® Dual String Section Mill
August 29, 2024
Aging Reservoirs, Deepwater, Intervention and Abandonment
-
RFID-Operated Stimulation Valve
July 2, 2024
Completions
-
RFID-Operated i-Stim® Remote Activated Fracture Stimulation Sleeve
July 2, 2024
Completions
-
RFID-Operated Inflow Outflow Control Device
July 2, 2024
Completions
LATEST HIGHLIGHTED CASE STUDIES
-
ESS® Expandable Sand Screen Provides One-Trip Installation, Zero Sand-Control Failures in 54 Wells
Sarawak, Malaysia
-
Advanced Kickover Tool Custom-Engineered for Subsea Gas Lift Intervention in Shut-In Gulf of Mexico Well, Production Restored Within Four-Month Window
Gulf of Mexico
LATEST REAL RESULTS
-
Advanced Kickover Tool Custom-Engineered for Subsea Gas Lift Intervention in Shut-In Gulf of Mexico Well, Production Restored Within Four-Month Window
August 19, 2024
United Kingdom
-
RFID Optibarrier™ Ball Valve Demonstrated Superior Debris Tolerance in Extreme Deepwater Well Environment in Brazil
August 16, 2024
Brazil
-
ForeSite® Edge Leverages High-Frequency Data and Autonomous Control to Boost Production 38%
August 13, 2024
Indonesia
-
ForeSite® Injection Rate Optimization and Gas Lift Analysis Achieves 25% Higher Production, a $1.2M Reduction in OPEX
July 25, 2024
United States
LATEST PAPERS
-
Drilling and Well Construction in Lean Clearances in Northern Region of Pakistan
December 19, 2023
-
Locating, Quantifying, and Remediating Downhole Sand Infiltration to Minimize Equipment Failures and Increase Oil Production: A Case Study in Kuwait
October 9, 2023