Innovative Perf-and-Plug System Saves More Than $800,000 by Recovering OBM and Setting Environmental

United Kingdom, North Sea

Integrated Drilling Solution Improves Well-to-Well Performance, Saves More Than 42 Days of Rig Time

Comalcalco, Tabasco, Mexico

Magnus® RSS and Quad-Combo LWD Technology Exceed Planned ROP by 40%, Save 5 Days’ Rig Time

Mexico

Firma™ Solution Including Custom Cutting Tool Cuts 27 Cemented Platform Well Conductors in a Batch P

North Sea, Norway

Fat Boy® PCP with Top-Tier System Increase MTBF from 55 to 370 Days, Decrease OPEX by 84%, Saves $2

Argentina

ForeSite® Edge Boosts Production 2%, Reduces Wellsite Visits 80%, Reduces Failures 15%, Increases Re

Wyoming, USA

Rod-Lift Solutions, Maximizer® Pumping Units Reduced OPEX 16% and Workover Costs 75% within Failure-

Northwest Oklahoma

Weatherford and Ardyne Technologies Deliver Innovative Casing-Recovery Solution for Fewer POB, Less

Norway

Integrated Solution and Centro™ Platform Deliver Well 62% Faster With 32% More Production

Comalcalco, Tabasco, Mexico

ForeSite® Platform Delivers ROI in 2 Months, Reduces Downtime 30%, Increases Production 2% In 111 Ma

South Sumatera, Indonesia