Real Results

All real results

Date Name
Jan 04
2007
ACP™ Annulus Casing Packer Converts into Open-Hole Bridge Plug to Permanently Plug Shale Formation, Dispose of Produced Water

Drilling, Real Result, Weatherford World

Nov 07
2006
Gas-Lift Optimization Audit Pays Off in Offshore Borneo

Production, Real Result, Weatherford World

Nov 01
2006
Tubing Packoffs with Live Gas-Lift Valves Restore Loaded High-Rate Gas Well to Production with Fast Payout

Aging Reservoirs, Conventional, Deepwater, Production, Real Result, Unconventional, Weatherford World

Oct 31
2006
Custom-Designed Gas-Lift Valve System Adds Up to 300 MCFD

Production, Real Result, Weatherford World

Oct 30
2006
Weatherford Gas-Lift Design Increases Production, Reduces Operating Costs

Aging Reservoirs, Conventional, Deepwater, Production, Real Result, Unconventional, Weatherford World

Aug 28
2006
Automatic Water Shutoff Solution Puts Major BP Subsea Well Back on Production, Removes Need for Second Intervention, Saving $5 Million

Conventional, Intervention and Abandonment, Real Result, Weatherford World

Jul 12
2006
Successful Sidetrack Through Hard Formation Saves BP America 25 Days

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World

Jun 22
2006
StarBurst™ Multilateral System Enables ChevronTexaco to Commingle Production from Two Separate Reservoir Intervals

Aging Reservoirs, Conventional, Deepwater, Intervention and Abandonment, Real Result, Weatherford World

May 09
2006
Inaugural MillThru™ System Installation Provides Operator with Highest-Producing Multilateral in Field

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World

Apr 11
2006
Triple-Zone Selective Gravel Pack Helps South Louisiana Independent Avoid Future Workovers to Save an Estimated $175,000

Completions, Conventional, Real Result, Weatherford World