Real Results

All real results

Date Name
Dec 18
2007
Thru-Tubing Service Restores Gas Production by Cutting Ultra-Hard, Specialty-Metal Tail Pipe

Conventional, Intervention and Abandonment, Real Result, Weatherford World

Nov 08
2007
Nodeco® Hanger System with Diamondback™ Reamer Shoe Allows Successful Sidetrack, Enables Well to Reach Total Depth

Aging Reservoirs, Conventional, Drilling, Real Result, Weatherford World

Nov 08
2007
BULLDOG™ Annulus Casing Packers Run Through Window with Whipstock Removed, Set in Horizontal to Stop Water and Solids Production in 41 Wells

Drilling, Real Result, Weatherford World

Oct 26
2007
Innovative Pack-Off Device Restores Production in Leaking Well, Saves $1.2 Million

Conventional, Intervention and Abandonment, Real Result, Weatherford World

Aug 07
2007
Cool Running of Weatherford’s Directional Tools—Even at 298°F

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World

Aug 07
2007
9 5/8-in. StarBurst™ Multilateral System Sets at New Depths in ERD Well at Remote Location

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World

Aug 07
2007
Successful 7-in. StarBurst™ Multilateral Deployment for Twin-Bore Well Construction

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World

Aug 07
2007
Successful Perforation of StarBurst™ Hollow Whipstock for Statoil North Sea Multilateral Well

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World

Aug 03
2007
QuickCut™ Casing Exit System Sidetracks Well, Saves Time and Money while Enabling Essential Coring Functions

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World

Jul 17
2007
Milling Out Well Obstruction in One Trip, Leaving Completion Undisturbed Saves $11 Million

Conventional, Intervention and Abandonment, Real Result, Weatherford World