Real Results

All real results

Date Name
Aug 26
2008
ESS® System Extends Technical Limits with Single-Trip Expansion in NW Australia

Completions, Conventional, Real Result, Weatherford World

Aug 22
2008
ESS® Expandable Sand Screens Achieve Neutral Skin in Deep, Hot, and Corrosive Gas Well After Three-Year Shutdown

Completions, Conventional, Real Result, Weatherford World

Aug 14
2008
ESS® Expandable Sand Screen Saves Expense of Deepwater OpenHole Gravel Pack, Helps Achieve High-Production Rate

Completions, Conventional, Real Result, Weatherford World

Aug 14
2008
Inflatable Retrievable Bridge Plug Passes through Narrow Wellhead to Isolate Zone, Saves Expenses by Minimizing Downtime

Conventional, Intervention and Abandonment, Real Result, Weatherford World

Jul 25
2008
Quickcut™ Casing Exit System and Wireline Shuttle Tools Successfully Sidetrack Difficult Open-Hole Section

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World

Jul 21
2008
MagnumFrac™ L CO2 Foam Frac Job Nearly Doubles Expected Production

Completions, Real Result, Unconventional, Weatherford World

Jul 08
2008
Shut-in Vertical Well Turned into Best Producer in the Field Using Expandable Sand Screens ESS®

Completions, Conventional, Real Result, Weatherford World

Jul 07
2008
Fit-for-Purpose Intervention Products Allow Client to Regain Control of Runaway Well Path

Conventional, Intervention and Abandonment, Real Result, Weatherford World

Jun 30
2008
Bundling Open-Hole Whipstocks and Inflatable Packers Saves Time and Money on Sidetracking Operations in Central Arkansas

Conventional, Intervention and Abandonment, Real Result, Weatherford World

Jun 30
2008
Open-Hole Whipstock with Inflatable Packer Allows Northern Louisiana Operator to Correct Azimuth in Problematic Wellbore

Aging Reservoirs, Conventional, Intervention and Abandonment, Real Result, Weatherford World