Real Results

All real results

Date Name
Dec 23
2022
Compact™ C-Thru, Interpretation Services Help to Identify Perforation Zones, Reduce Water Cut, and Achieve Production of 1,300 BOPD

Formation Evaluation, Real Result

Dec 23
2022
Raptor® System and Interpretation Services Detect Gas Reserves Behind Casing, Enable 4x Higher Production Than Estimated

Formation Evaluation, Real Result

Dec 23
2022
Renaissance® WDCL Safety Valve System Saves Inoperable Well and $14 Million in Rig OPEX, Restores Production of 2,000 bbl per Day

Intervention and Abandonment, Real Result, Weatherford World

Dec 23
2022
WidePak™ Straddle Packer System Restored Well Integrity in Four Corroded Wells, Saved $20 Million in Workover Costs

Intervention and Abandonment, Real Result, Weatherford World

Dec 23
2022
WidePak™ Straddle Packer System Provides Water-Shut-Off Solutions in Gas Well Reduces Water Cut 30%, Increases Production 300% Riglessly Installed in 24 Hours with Zero Incidents

Real Result, Weatherford World

Dec 07
2022
Underbalanced Workover Removed Scale from Environmentally Sensitive Geothermal Well, Enabled Submersible Pump to Recover Geothermal Water

Drilling, Real Result, Weatherford World

Dec 07
2022
Reservoir Evaluation System Recognized Gas Retrograde Condensate for Newly Discovered Low-Resistivity Pay Zone

Formation Evaluation, Real Result, Weatherford World

Dec 01
2022
Magnus RSS, MPD Techniques Combined to Mitigate Ballooning Effect, Reduced Drilling Time by 25%, Eliminated NPT

Drilling, Real Result, Weatherford World

Oct 28
2022
ISO-Flex™ High-Expansion Retrievable Bridge Plug Overcomes Well Obstruction During Temporary Abandonment Workover, Operator Saves Six Rig Days

Completions, Real Result, Weatherford World

Oct 20
2022
Vero® Automated Connection Integrity Made Up 3,000 Connections, Saved Over 42 Hours of Rig Time for Major Operator in Deepwater Gulf of Mexico

Real Result, Tubular Running Services, Weatherford World